Tally 7.2 to TallyPrime Migration: How to Convert Old Tally Data

Updated Tally Experts

Migrating old Tally data to TallyPrime

You cannot convert Tally 7.2 data to TallyPrime in one step. First migrate it to Tally.ERP 9 with the tally72migration.exe tool, then open that company in TallyPrime and migrate it again. The same 2-step route applies to Tally 5.4 and 6.3 data.

This guide walks through both steps, explains which Tally migration tool fits which situation, and lists the checks to run before you trust the migrated data.

Why Tally 7.2 Needs a 2-Step Migration

TallyPrime can detect and migrate data from Tally.ERP 9 and earlier TallyPrime releases, but data from releases older than Tally.ERP 9 has to be moved to Tally.ERP 9 first. Your transactions, company features, masters and security settings are carried forward.

Flow diagram: Tally 5.4, 6.3 or 7.2 data goes to Tally.ERP 9 using tally72migration.exe, then to TallyPrime using the Migrate option.
Step 1 happens in Tally.ERP 9; step 2 happens in TallyPrime.Source: Tally Experts · Click the image to open its original size.

Before You Migrate

  • Back up the old data and keep that copy untouched. Once migrated, lower versions cannot use the same company data.
  • Check TSS. A valid Tally Software Services subscription is needed to migrate to the latest TallyPrime release.
  • Check the system. Tally Solutions asks for at least 4 GB RAM, with more RAM and SSD storage recommended.
  • Review GST details such as GSTIN/UIN, state and registration type.
  • Plan for large data. For companies with many transactions, Tally Solutions suggests splitting the data and migrating only the current financial year.
  • List your TDLs and confirm with whoever wrote them that they work on the latest release.
  • Pick a quiet time, outside business hours.

If you also need to move the data to a new computer, see How to Safely Transfer Tally Data to a New System Without Errors.

Step 1: Tally 7.2 to Tally.ERP 9

  1. Install Tally.ERP 9 and get the tally72migration.exe tool. It is available in the Tally.ERP 9 installation folder or as a download from Tally Solutions.
  2. Copy the Tally 7.2 company folder into the Tally.ERP 9 data folder.
  3. Start tally72migration.exe and select Migrate Data.
  4. Enter the data path in Directory and select the company in Name.
  5. Press Enter at Rewrite? and at Backup before rewriting?, then at Migrate?.
  6. When Migration Completed, Check Statistics appears, compare the statistics to confirm that everything moved.

The migrated company gets an extra 0 in front of its number and becomes a 5-digit folder, for example 0099 becomes 00099. If errors occur, they are logged in a migration.err file in the Tally.ERP 9 folder.

Step 2: Tally.ERP 9 to TallyPrime

  1. Copy the migrated company folder into the TallyPrime data folder.
  2. Open TallyPrime and press Alt+F3 (Select Company). The company shows the status Migration Required. You can also use F1 (Help) > Troubleshooting > Migrate.
  3. Select the company and enter its username and password if it has one.
  4. Press R (Migrate). Press C (Configure) first if you want to change the backup path or data location.

From Release 6.0, TallyPrime runs a pre-migration check and asks you to repair corrupted data in the older version before you continue. From Release 3.0, you can view a summary of the migrated data.

Tally Migration Tools and When to Use Them

The right tool depends on where the data is now:

  • tally72migration.exe: for Tally 5.4, 6.3 and 7.2 data, to reach Tally.ERP 9.
  • TallyPrime's built-in Migrate option: for Tally.ERP 9 data and older TallyPrime releases.
  • Repair in the older version: when the pre-migration check finds corrupted data.
  • XML export and import: for entries made in the old company after the backup. Tally Solutions suggests exporting them to XML and importing them into the migrated company. See our Step-by-Step Guide: Excel to Tally XML Import Made Easy.
  • Excel import: when the data is not in Tally at all. This is an import, not a migration; see how to import Excel data in TallyPrime.
Table: Tally 5.4, 6.3 or 7.2 uses two steps; Tally.ERP 9 or older TallyPrime migrates directly; damaged data is repaired first; Excel or other software is imported, not migrated.
Start from where your data is today.Source: Tally Experts · Click the image to open its original size.

Checks After Migration

Do not start entering vouchers until the migrated company matches the old one.

Table of reports to compare after migration: Trial Balance, Day Book, Stock Summary, Outstandings and GST details.
Note these figures in the old company before you migrate, then compare.Source: Tally Experts · Click the image to open its original size.

Also check voucher numbering for each voucher type, and how HSN/SAC summaries are set up, as both can be configured during migration.

Common Migration Problems

  • Company not listed: the folder was not copied into the data folder TallyPrime is using.
  • Migration stops on corrupted data: repair the company in the older version, then migrate again.
  • Statistics do not match: restore the backup and run the migration again before entering new data.
  • Old customizations stop working: old TDLs may need to be rewritten for TallyPrime.
  • Migration is slow on large data: split the data and migrate the current year.

When to Get Expert Help

A clean Tally.ERP 9 company usually migrates without help. Get support when the data is very old or damaged, the company uses custom TDLs, there are several companies or branches, or you are also bringing data from Excel or another system. For data that is not in Tally yet, our Excel to Tally import services handle mapping and checks.

Conclusion

To convert Tally 7.2 data to TallyPrime, go through Tally.ERP 9: run tally72migration.exe, check the statistics, then migrate the company in TallyPrime. Keep the original backup, compare key reports, and only then start working in the migrated company.

If your migration involves old data, custom TDLs or several companies, Tally Experts can plan it with you and check the result.

You can connect with us on WhatsApp. Say Hi

FAQs on Tally 7.2 to TallyPrime Migration

1. How do I convert Tally 7.2 data to TallyPrime?

Migrate it in two steps. Use tally72migration.exe to move the data to Tally.ERP 9, then copy the company into the TallyPrime data folder and migrate it there.

2. Can Tally 7.2 data be migrated directly to TallyPrime?

No. Data from Tally 5.4, 6.3 and 7.2 must first be migrated to Tally.ERP 9.

3. Where do I get tally72migration.exe?

It is available in the Tally.ERP 9 installation folder or as a download from the Tally Solutions website.

4. How do I migrate Tally.ERP 9 data to TallyPrime?

Copy the company folder into the TallyPrime data folder, press Alt+F3, select the company marked Migration Required and press R to migrate.

5. Can I use the old Tally version after migration?

Not with the same migrated data. Lower versions cannot use data once it is migrated, so keep a backup of the original.

6. Do I need an active TSS to migrate?

A valid TSS is required to migrate to the latest TallyPrime release.

7. What should I check after migration?

Compare Trial Balance, Day Book voucher count, Stock Summary, outstandings and GST details with the old company before entering new data.

Continue Reading

Join Our Tally Newsletter

Latest Updates, Features, Modules Info on Tally Customization

Original screenshot

Shown at its original resolution. Scroll within this panel to inspect the software labels on a small screen. Example values are not settings to copy.

Want our TallyPrime tips in Google first? Add us as a preferred source.

Add Tally Experts as a preferred source on Google

Join Our Tally Newsletter

Latest Updates, Features, Modules Info on Tally Customization

Get a personal consultation.

Call us today at +919211044269